Description
One pair of conversion driveshafts to run with a MA gearbox and BE hubs.
Uprated driveshafts to run the larger/stronger BE CV joints and larger/stronger bar shafts, but with MA internal splines to fit the MA gearbox.
We can also supply modified BE drive flanges to suit the OE 106/Saxo hub if required.
Please specify required length/application when ordering.
Manufacturing and assembly lead times are 2-4 weeks.